Copy Report - 12818501 RECP (16 JUL 86)
Sir Robert "Rawlinson to the Crown Agents
London April 1886.
Hong Kong Water Works - Tytam Reservoir Works
Gentlemen,
I have duly received copy of Monthly returns of the progress and costs of the works at Tytam, as also for the Conduit on the Victoria side.
With respect to the costs of the Tunnel, I observe that these have been acting.
: Installation Costs.
Making a total of per lineal Yard £12 + 3 + £18 + 10 + C
This is however in excess of English rates. In a previous statement I gave English costs as under.
Liverpool Water Works Tunnel complete in hard rock, sectional area, £8.0.0 per lineal Yard.
Manchester Water Works Tunnels on hard rock. About 50 Square Metres on section complete.
In hard rock £10.0.0 per Yard. In rock requiring to be lined with brick or masonry set in Cement £14.0.0 per lineal Yard. These prices are for work complete. Contract with Hong Kong work consequently.
Page 1
(To be continued)
However, to follow the exact format requested, here is the revised output in HTML:Copy Report - 12818501 RECP(16 JUL 86)
Sir Robert "Rawlinson to the Crown Agents
London April 1886.
Hong Kong Water Works - Tytam Reservoir Works
Gentlemen,
I have duly received copy of Monthly returns of the progress and costs of the works at Tytam, as also for the Conduit on the Victoria side.
With respect to the costs of the Tunnel, I observe that these have been acting.
: Installation Costs.
Making a total of per lineal Yard £12 + 3 + £18 + 10 + C
This is however in excess of English rates. In a previous statement I gave English costs as under.
Liverpool Water Works Tunnel complete in hard rock, sectional area, £8.0.0 per lineal Yard.
Manchester Water Works Tunnels on hard rock. About 50 Square Metres on section complete.
In hard rock £10.0.0 per Yard. In rock requiring to be lined with brick or masonry set in Cement £14.0.0 per lineal Yard. These prices are for work complete. Contract with Hong Kong work consequently.
Page 1
$
Ο.
Copy Report -
12818501
RECP
Whoo! 16 JUL 86)
Sir Robert "Rawlinson to the "Crown Agents
Lendon April 1886.
Hong Kong Water Works - Sytam Reservoir Works
Gentlemen,
I have duly received copy of Montlity
returns of the progress and costs of the works
at Tytam
as also for the Conduit
Victoriae side.
مجھے تمر اجمع
the
With respect to the costs of the Junnel Sobserve that these have been
اریم و
Acteling.
: Instalation Costs.
Waking a total of
pur Sincal Yard £ 12
+3
•
3
b J
t b
£18 +10 + C
This is however in excess of English rest . In a previous statement I gave English costs
að under.
هم نرسم
Liverpool Water Works Tumel complete hasel rock, sectional area Ititat. $8.0.0
Limial Garet complete.
prer
اللهم
Hanchester Water Works Tunnels on hardrock.
About 50 Square Met on section complete.
In
Lincal
hard rock 110.0.0 per Yard. In rock requiring to be lined " with brick or masonry set in Cement £14.00 per Simal Yard. These prices
are for work complete. Contract with Hong Kong work consequently
The
ury
Is
I